The method

Discussion informs. Evidence verifies.

Discussion informs the assessment; a controlled document, record, demonstration or physical inspection verifies it. An unavailable document remains an unverified finding.

The evidence-to-decision sequence

Every readiness criterion runs through the same five steps — developed and proven in real institutional launches.

  1. 1. Understand

    Define the criterion and why it matters for operating safely at launch.

  2. 2. Review

    Review the current finding and the gap against the minimum condition.

  3. 3. Validate

    Confirm the facts with the responsible actor — not with the reporting chain.

  4. 4. Evidence

    Inspect documents, records, systems or facilities. Claims without evidence stay unverified.

  5. 5. Decide

    Classify readiness and agree actions, owner and deadline for every open point.

Claimed vs. proven readiness

A positive status alone is never sufficient. IORS tracks a readiness status and an evidence status separately, so the gap between what is claimed and what is proven stays visible — and a criterion can only be Verified once its evidence has actually been reviewed. Read more →

Gate logic

Certain criteria are mandatory gates: launch conditions that cannot be bypassed. A project can reach a high overall score and still not be allowed to start — because a single central safety, financing, staffing or approval precondition is missing. Read more →

Readiness status definitions

Not StartedNo credible action or evidence yet.
In ProgressAction underway but the minimum condition is not yet met.
ConditionalMinimum condition appears achievable or partly met, but material evidence or close-out is still pending.
VerifiedMinimum condition met and the evidence has been reviewed.
Not ApplicableCriterion formally determined not applicable to the launch scope. Excluded from the score; counts as a passed gate.

The decision rule

GO requires two things at once: every mandatory gate criterion is Verified (or formally Not Applicable) AND the overall weighted readiness score meets the project threshold (default 80%). If only one of the two holds, the decision is CONDITIONAL GO. If neither holds, it is NO-GO. A single open gate blocks GO regardless of how high the score is.

Each criterion contributes its weight × a status score: Verified = 1.0, Conditional = 0.5, In Progress = 0.25, Not Started = 0. Not Applicable criteria are excluded entirely. The weighted average across all criteria gives the readiness score.

The GO / NO-GO decision in depth →